Excellence in Construction of Commercial Buildings $20M - $30M Winner 2013

John George Knight Heritage Winner 2010

Excellence in Health & Safety Winner 2015

MBAV Excellence in Construction Awards Finalist 2010

Public Architecture Alterations & Additions Winner 2010

Public Architecture Alterations & Additions Winner 2010

Excellence in Construction of Commercial Buildings $5M - $10M Winner 2014

Master Builder of the Year 2013

Follow us on instagram @_apmgroup

Lvl 9, 168 Exhibition Street Melbourne 3000   |   03 8413 0000   |

  • Black Instagram Icon
  • Black LinkedIn Icon

Copyright © 2018. All rights reserved APM Group (AUST) Pty Ltd

THE SALVATION ARMY CITY TEMPLE REFURBISHMENT

THE SALVATION ARMY CITY TEMPLE REFURBISHMENT

CLIENT:

Salvation Army

LOCATION:

Bourke Street, Melbourne CBD, VIC

DURATION:

60 Weeks

PROJECT DESCRIPTION:

The redevelopment of the City Temple and administration offices in Bourke Street included the staged demolition works and the extension/refurbishment of an existing heritage listed building. The project included the addition of two floors and was staged to allow Salvation Army staff to continue providing community support services from the site throughout the construction process. Given the site restraints of Bourke Street and adjoining buildings, APM developed a construction methodology using prefabricated clad wall panels for the two-level rooftop extension. This minimised the time period for which the existing areas were exposed after removal of the existing roof for extension.

1/7